Electricity Distribution Rehabilitation and IPP Hydropower Development (Angola).

Appointed as lead consultant to provide technical assistance for the client in preparation of the Master Plan for the rehabilitation and expansion of the electricity distribution networks for two cities in Angola, and conduct pre-feasibility study for two IPP mini-hydroelectric stations.

img4

Key objectives:

Preparation the economic and technical documents for pre-feasibility study on issues related to economic growth, electricity demand for the two sites at Kaquima and Chafinda.

Perform analysis that entails the development of one or more, if appropriate, conceptual options for each hydropower project installation, specifying equipment and configuration, capacity and output estimates, as well as projected costs for the two sites, Provide assistance to USTDA on commercial evaluation of the bids received for the development of the project including drafting of requests for proposals and related schedules.

Asses and diagnose the state of existing distribution infrastructure for the two cities (Cuchi andLuea).

Conduct information collection to undertake a study on projected energyconsumptionover the next 20 years.

Conduct information data and make observations of the sites, and determine possible corridor for the transmission line to deliver power from the sites to the localmini-grid.

  • Date : 2010
  • Location : Angola
  • Client : USTDA
View Project